Hyderabad Metro

hmrl

HYDERABAD METRO RAIL LTD




 

Stations:

3 Corridors – 66 Stations – 3 Interchange Stations.

Corridor ICorridor IICorridor III
Miyapur to L B Nagar – 27 StationsJBS to Falaknuma – 16 StationsNagole to Shilparamam – 23 Stations

 

Stations – Corridor I:
MiyapurJNTU CollegeKPHB Colony
KukatpallyBalanagarMoosapet
Bharat NagarErragaddaESI Hospital
S R NagarAmeerpetPunjagutta
Irrum ManzilKhairatabadLakdikapul
AssemblyNampallyGandhi Bhavan
Osmania Medical CollegeMG Bus stationMalakpet
New MarketMusarambaghDilsukhnagar
ChaitanyapuriVictoria MemorialL B Nagar

 

Stations – Corridor II:
JBSParade GroundsSecunderabad
Gandhi HospitalMusheerabadRTC Cross Roads
ChikkadpallyNarayangudaSultan Bazar
M G Bus StationSalarjung MuseumCharminar
ShalibandaShamsher GunjJungametta
Falaknuma

 

Stations – Corridor III:
NagoleUppalSurvey of India
NGRIHabsigudaTarnaka
MettugudaSecunderabadParade Grounds
ParadiseRasool PuraPrakash Nagar
BegumpetAmeerpetMadhura Nagar
Yusuf GudaRoad No 5 Jubilee HillsJubilee Hills Check Post
Pedamma TempleMadhapurDurgam Chervu
HITEC CityShilparamam

 

Interchange Stations:
Ameerpet StationCorridor I & III
M G B S StationCorridor I & II
Parade Grounds StationCorridor II & III

Rolling Stock

Train Set3 Cars train set (DMC‐TC‐DMC)
Extendable to 6 Cars train set (DMC‐TC‐MC‐MC‐TC‐DMC)
GaugeStandard Gauge (1435 mm)
Traction25 kV AC Overhead Catenary, Single phase and 50 Hz frequency
Maximum Design Speed90 kmph
Maximum Operating Speed80 Kmph
Average Speed33 kmph
Head way between two trains3 minutes during peak and 15 minutes during lean hours
Dwell Time20 seconds at stations
Maximum Axle Load17 Ton with 8 Passenger/Square metre in standing area

Track work

SN.CRITERIADIMENSION
1.Gauge1435 mm
2.Design speed
Max. operating speed
90 Kmph
80 Kmph
3.Max. axle load, loaded condition17 tonne
4.Maximum Gradient
Normal / desirable Limit
Exceptional Limit
2.5%
4%
5.Sharpest vertical curve radius
Sharpest horizontal curve radius
1500m
120 m (main line track)
90 m (depot track
6.Traction power collectionOverhead Catenary system (OCS) at 25kV(AC)
Rails shall be used for traction return current.
7.Inclination of Rail1 in 40
8.Wheel tread profileUIC 510-2 (S1002); to be interfaced with Rolling Stock Contractor.
9.Rail profileUIC 60 (861-3)

AFC

The proposed system comprises of following key sub-systems:

  • Automatic Gates
  • Ticket Vending Machines
  • Add Value Machines
  • Ticket Office Machines
  • Ticket Readers
  • Portable Ticket Analysers

Power Supply & Traction

OHE at Main LineConventional regulated type
OHE at YardsTramway regulated type
System voltage25 kV AC, 1Ø, 50 Hz
Design Speed90 kmph
Operational Speed80 kmph
Auxiliary Power Transformer132/33 kV, oil type
Traction Power Transformer132/25 kV, oil type
Auxiliary Transformer (at Station & Depots)33/415 V, Dry Type
33 kV cableRing main network
Height of OHE above the Rail level5.00 Meter

Signalling & Train Control

  • The advanced signalling & Train Control technology, Communication Based Train Control (CBTC), is adopted for Hyderabad Metro to control the trains. Hyderabad Metro would be first in India to claim train control by CBTC technology. The trains running on three corridors will be controlled and monitored from state-of-the-art Operation Control Centre (OCC) at Uppal.
  • The trains can run with headway of 90 Sec to tackle commuters during office peak hours in morning and in evening. The overview display panel will mimic all three corridors and indicate current locations of all trains running on these corridors. The OCC shall be the primary control centre having a back-up control centre at Uppal depot to take over the operation if the OCC to be evacuated due to unforeseen situation.